The first picture to the left shows how the window was bulking and has the tape attached.
This second photo is of the entire entranceway.
This photo shows the carton that was made and the now disassembled glass being placed on the carton.
The transom being taken apart to be reassembled with new lead came.
The window upclose as it is layed out on the carton.